First, before the start of preparation: 1. Inspect all joints are secure, each rotary sliding parts are flexible and reliable. 2. Check the drive motor and power connections, jog the motor rotation di
©China Mining&Construction Equipment Co., Ltd. © 2016
Address:No. 11, North of Kaiyuan Road, High-tech Zone, Jining City, Shandong Province, China
Executive Editor:Zhang Wen